Winter Work 2008/2009

Tuesday, 04 August 2009

Home
Up

 

Winter work 2008/2009

Some photos of what went on over the 2008 winter.

Engine out

The engine spent most of the winter in this position!

Slave cylinder spacer

David saves some weight by milling lumps out of the spacers for the hydraulic clutch slave cylinder

Pedal box

A view of the floor mounted pedal box

Pedal box

With no bodyshell, you get a good view of the pedal box installation

Brake balance

A new twiddly knob on the dash means we have proper control of the brake balance at last

Slave cylinder spacers

The finished slave cylinder spacer sits on top of the refreshed gearbox

Bell housing spacer

Stephen gave the weight saving treatment to the bell housing spacer plate

Light weight spacers

The newly lightened spacers await installation

 

Home | Up | Winter Work 2008/2009 | SSCC Sprint 11/04 | Machars 24/05 | Golspie 06/06 | EACC Sprint 13/06 | Boyndie Sprint 04-05/07 | Alford Sprint 11-12/07 | British Championship 01-02/08

This site was last updated 03/24/09